ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Industrial instruments for measurement, display, and control of process variables; and related products
3+ Characters Required for Products

61

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $236k 34k
MMBtu
$9.02
- Electrical $167k 2,690k
kWh
$0.078
- Natural Gas $28k 6.1k
MMBtu
$6.10

465

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $32k 2.9k
MMBtu
8.7%
- Electrical $21k 287k
kWh
10.7%
- Natural Gas $4.0k -
MMBtu
-
Waste $3.3k
Productivity/Other $11k
TOTAL $45k
*May be negative reflecting an increased cost component required to save energy and costs overall

57

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $227k 34k
MMBtu
$8.33
- Electrical $162k 2,741k
kWh
$0.072
- Natural Gas $27k 6.1k
MMBtu
$5.74

219

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $15k 1.5k
MMBtu
4.4%
- Electrical $10k 149k
kWh
5.4%
- Natural Gas $2.7k -
MMBtu
-
Waste $1.5k
Productivity/Other $7.7k
TOTAL $25k
*May be negative reflecting an increased cost component required to save energy and costs overall