ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Industrial instruments for measurement, display, and control of process variables; and related products
3+ Characters Required for Products

58

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $224k 34k
MMBtu
$8.77
- Electrical $160k 2,697k
kWh
$0.076
- Natural Gas $27k 6.0k
MMBtu
$6.01

445

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $30k 2.9k
MMBtu
8.4%
- Electrical $19k 278k
kWh
10.3%
- Natural Gas $4.2k -
MMBtu
-
Waste $3.1k
Productivity/Other $11k
TOTAL $44k
*May be negative reflecting an increased cost component required to save energy and costs overall

54

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $223k 35k
MMBtu
$8.08
- Electrical $159k 2,750k
kWh
$0.071
- Natural Gas $28k 6.3k
MMBtu
$5.97

209

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $14k 1.4k
MMBtu
4.1%
- Electrical $9.0k 140k
kWh
5.1%
- Natural Gas $2.9k -
MMBtu
-
Waste $1.6k
Productivity/Other $7.4k
TOTAL $23k
*May be negative reflecting an increased cost component required to save energy and costs overall