ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Industrial instruments for measurement, display, and control of process variables; and related products
3+ Characters Required for Products

59

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $238k 34k
MMBtu
$8.91
- Electrical $168k 2,729k
kWh
$0.077
- Natural Gas $28k 6.1k
MMBtu
$6.03

451

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $32k 3.0k
MMBtu
8.8%
- Electrical $21k 292k
kWh
10.7%
- Natural Gas $4.1k -
MMBtu
-
Waste $3.0k
Productivity/Other $11k
TOTAL $46k
*May be negative reflecting an increased cost component required to save energy and costs overall

55

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $222k 34k
MMBtu
$8.21
- Electrical $158k 2,717k
kWh
$0.071
- Natural Gas $28k 6.2k
MMBtu
$5.86

219

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $16k 1.6k
MMBtu
4.6%
- Electrical $11k 154k
kWh
5.7%
- Natural Gas $2.8k -
MMBtu
-
Waste $1.6k
Productivity/Other $8.0k
TOTAL $26k
*May be negative reflecting an increased cost component required to save energy and costs overall