ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Industrial instruments for measurement, display, and control of process variables; and related products
3+ Characters Required for Products

60

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $240k 34k
MMBtu
$8.92
- Electrical $169k 2,732k
kWh
$0.077
- Natural Gas $28k 6.2k
MMBtu
$6.06

458

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $32k 3.0k
MMBtu
8.7%
- Electrical $21k 291k
kWh
10.7%
- Natural Gas $4.1k -
MMBtu
-
Waste $3.4k
Productivity/Other $11k
TOTAL $46k
*May be negative reflecting an increased cost component required to save energy and costs overall

56

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $220k 34k
MMBtu
$8.33
- Electrical $156k 2,680k
kWh
$0.072
- Natural Gas $27k 6.1k
MMBtu
$5.81

219

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $16k 1.6k
MMBtu
4.6%
- Electrical $10k 151k
kWh
5.7%
- Natural Gas $2.8k -
MMBtu
-
Waste $1.6k
Productivity/Other $7.8k
TOTAL $25k
*May be negative reflecting an increased cost component required to save energy and costs overall