ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Laboratory apparatus and furniture
3+ Characters Required for Products

20

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $340k 42k
MMBtu
$8.35
- Electrical $206k 3,354k
kWh
$0.072
- Natural Gas $44k 7.0k
MMBtu
$5.85

157

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $42k 4.0k
MMBtu
9.6%
- Electrical $26k 393k
kWh
11.7%
- Natural Gas $6.7k -
MMBtu
-
Waste $2.9k
Productivity/Other $38k
TOTAL $83k
*May be negative reflecting an increased cost component required to save energy and costs overall

20

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $340k 42k
MMBtu
$8.35
- Electrical $206k 3,354k
kWh
$0.072
- Natural Gas $44k 7.0k
MMBtu
$5.85

86

Implemented Recommendations

4.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $20k 2.3k
MMBtu
5.5%
- Electrical $16k 226k
kWh
6.7%
- Natural Gas $0.7k -
MMBtu
-
Waste $2.9k
Productivity/Other $21k
TOTAL $43k
*May be negative reflecting an increased cost component required to save energy and costs overall