ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Search, detection, navigation, guidance, aeronautical, and nautical systems, instruments, and equipment
3+ Characters Required for Products

31

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,087k 182k
MMBtu
$7.19
- Electrical $560k 12,584k
kWh
$0.052
- Natural Gas $198k 52k
MMBtu
$5.43

209

Recommendations

6.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $63k 8.5k
MMBtu
4.7%
- Electrical $42k 828k
kWh
6.6%
- Natural Gas $4.8k -
MMBtu
-
Waste $29k
Productivity/Other $55k
TOTAL $147k
*May be negative reflecting an increased cost component required to save energy and costs overall

29

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,114k 191k
MMBtu
$6.56
- Electrical $565k 13,172k
kWh
$0.047
- Natural Gas $211k 56k
MMBtu
$5.31

79

Implemented Recommendations

2.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 4.3k
MMBtu
2.3%
- Electrical $19k 423k
kWh
3.2%
- Natural Gas $0.3k -
MMBtu
-
Waste $8.3k
Productivity/Other $20k
TOTAL $53k
*May be negative reflecting an increased cost component required to save energy and costs overall