ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Search, detection, navigation, guidance, aeronautical, and nautical systems, instruments, and equipment
3+ Characters Required for Products

29

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,085k 187k
MMBtu
$6.78
- Electrical $570k 12,853k
kWh
$0.050
- Natural Gas $201k 55k
MMBtu
$5.39

194

Recommendations

6.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $58k 8.3k
MMBtu
4.4%
- Electrical $42k 812k
kWh
6.3%
- Natural Gas $5.0k -
MMBtu
-
Waste $31k
Productivity/Other $59k
TOTAL $148k
*May be negative reflecting an increased cost component required to save energy and costs overall

27

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,125k 198k
MMBtu
$6.42
- Electrical $584k 13,519k
kWh
$0.048
- Natural Gas $214k 59k
MMBtu
$5.05

75

Implemented Recommendations

2.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $23k 4.0k
MMBtu
2.0%
- Electrical $18k 393k
kWh
2.9%
- Natural Gas $0.3k -
MMBtu
-
Waste $9.0k
Productivity/Other $21k
TOTAL $53k
*May be negative reflecting an increased cost component required to save energy and costs overall