ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Measuring, analyzing, and controlling instruments; photographic, medical and optical goods; watches and clocks
3+ Characters Required for Products

589

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $569k 121k
MMBtu
$8.83
- Electrical $372k 5,969k
kWh
$0.072
- Natural Gas $65k 59k
MMBtu
$5.47

4,315

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $81k 9.1k
MMBtu
7.5%
- Electrical $62k 886k
kWh
14.8%
- Natural Gas $1.5k -
MMBtu
-
Waste $4.5k
Productivity/Other $31k
TOTAL $116k
*May be negative reflecting an increased cost component required to save energy and costs overall

569

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $561k 122k
MMBtu
$8.59
- Electrical $369k 5,936k
kWh
$0.070
- Natural Gas $63k 60k
MMBtu
$5.29

1,951

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $29k 3.3k
MMBtu
2.7%
- Electrical $23k 321k
kWh
5.4%
- Natural Gas $1.5k -
MMBtu
-
Waste $1.1k
Productivity/Other $12k
TOTAL $42k
*May be negative reflecting an increased cost component required to save energy and costs overall