ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Measuring, analyzing, and controlling instruments; photographic, medical and optical goods; watches and clocks
3+ Characters Required for Products

584

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $565k 122k
MMBtu
$8.80
- Electrical $370k 5,958k
kWh
$0.072
- Natural Gas $64k 59k
MMBtu
$5.41

4,269

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $80k 9.0k
MMBtu
7.4%
- Electrical $61k 881k
kWh
14.8%
- Natural Gas $1.5k -
MMBtu
-
Waste $4.5k
Productivity/Other $30k
TOTAL $115k
*May be negative reflecting an increased cost component required to save energy and costs overall

563

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $554k 122k
MMBtu
$8.60
- Electrical $365k 5,860k
kWh
$0.070
- Natural Gas $61k 60k
MMBtu
$5.31

1,944

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $30k 3.3k
MMBtu
2.7%
- Electrical $23k 324k
kWh
5.5%
- Natural Gas $1.5k -
MMBtu
-
Waste $1.1k
Productivity/Other $12k
TOTAL $43k