ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Measuring, analyzing, and controlling instruments; photographic, medical and optical goods; watches and clocks
3+ Characters Required for Products

572

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $561k 122k
MMBtu
$8.63
- Electrical $368k 5,921k
kWh
$0.071
- Natural Gas $63k 60k
MMBtu
$5.36

4,196

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $75k 8.0k
MMBtu
6.5%
- Electrical $56k 777k
kWh
13.1%
- Natural Gas $2.9k -
MMBtu
-
Waste $4.5k
Productivity/Other $32k
TOTAL $111k
*May be negative reflecting an increased cost component required to save energy and costs overall

543

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $558k 125k
MMBtu
$8.44
- Electrical $367k 5,956k
kWh
$0.069
- Natural Gas $62k 62k
MMBtu
$5.30

1,878

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $30k 3.4k
MMBtu
2.7%
- Electrical $23k 327k
kWh
5.5%
- Natural Gas $1.5k -
MMBtu
-
Waste $1.2k
Productivity/Other $12k
TOTAL $42k
*May be negative reflecting an increased cost component required to save energy and costs overall