ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Transportation equipment, not elsewhere classified
3+ Characters Required for Products

22

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $349k 60k
MMBtu
$6.50
- Electrical $212k 4,056k
kWh
$0.060
- Natural Gas $79k 16k
MMBtu
$4.82

169

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $34k 3.5k
MMBtu
5.9%
- Electrical $21k 345k
kWh
8.5%
- Natural Gas $6.8k -
MMBtu
-
Waste $17k
Productivity/Other $51k
TOTAL $101k
*May be negative reflecting an increased cost component required to save energy and costs overall

22

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $349k 60k
MMBtu
$6.50
- Electrical $212k 4,056k
kWh
$0.060
- Natural Gas $79k 16k
MMBtu
$4.82

81

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $15k 2.0k
MMBtu
3.3%
- Electrical $12k 194k
kWh
4.8%
- Natural Gas $1.7k -
MMBtu
-
Waste $3.9k
Productivity/Other $13k
TOTAL $33k