ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Travel trailers and campers
3+ Characters Required for Products

18

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $149k 22k
MMBtu
$6.04
- Electrical $81k 1,395k
kWh
$0.055
- Natural Gas $58k 7.7k
MMBtu
$4.89

127

Recommendations

7.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $24k 1.6k
MMBtu
7.1%
- Electrical $9.2k 154k
kWh
11.0%
- Natural Gas $12k -
MMBtu
-
Waste $1.5k
Productivity/Other $383k
TOTAL $409k
*May be negative reflecting an increased cost component required to save energy and costs overall

18

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $149k 22k
MMBtu
$6.04
- Electrical $81k 1,395k
kWh
$0.055
- Natural Gas $58k 7.7k
MMBtu
$4.89

73

Implemented Recommendations

4.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $13k 1.2k
MMBtu
5.2%
- Electrical $7.4k 112k
kWh
8.0%
- Natural Gas $3.9k -
MMBtu
-
Waste $0.4k
Productivity/Other $14k
TOTAL $27k
*May be negative reflecting an increased cost component required to save energy and costs overall