ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous transportation equipment
3+ Characters Required for Products

47

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $553k 92k
MMBtu
$6.36
- Electrical $303k 5,627k
kWh
$0.058
- Natural Gas $104k 19k
MMBtu
$4.93

354

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $116k 6.8k
MMBtu
7.4%
- Electrical $33k 663k
kWh
11.8%
- Natural Gas ($-2.3)k -
MMBtu
-
Waste $8.3k
Productivity/Other $173k
TOTAL $297k
*May be negative reflecting an increased cost component required to save energy and costs overall

47

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $553k 92k
MMBtu
$6.36
- Electrical $303k 5,627k
kWh
$0.058
- Natural Gas $104k 19k
MMBtu
$4.93

178

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $55k 3.7k
MMBtu
4.0%
- Electrical $19k 360k
kWh
6.4%
- Natural Gas ($-8.4)k -
MMBtu
-
Waste $2.0k
Productivity/Other $12k
TOTAL $70k