ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Motorcycles, bicycles, and parts
3+ Characters Required for Products

9

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $386k 50k
MMBtu
$10.46
- Electrical $194k 4,063k
kWh
$0.085
- Natural Gas $77k 8.0k
MMBtu
$7.67

61

Recommendations

6.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $31k 2.7k
MMBtu
5.4%
- Electrical $16k 262k
kWh
6.5%
- Natural Gas $7.5k -
MMBtu
-
Waste $3.8k
Productivity/Other $24k
TOTAL $59k
*May be negative reflecting an increased cost component required to save energy and costs overall

9

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $386k 50k
MMBtu
$10.46
- Electrical $194k 4,063k
kWh
$0.085
- Natural Gas $77k 8.0k
MMBtu
$7.67

28

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $14k 1.9k
MMBtu
3.8%
- Electrical $8.6k 182k
kWh
4.5%
- Natural Gas $0.2k -
MMBtu
-
Waste $2.8k
Productivity/Other $20k
TOTAL $37k
*May be negative reflecting an increased cost component required to save energy and costs overall