The ITAC Statistics page displays the average assessment results for the selected criteria.
9
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $386k | 50k |
MMBtu
|
$10.46 |
- Electrical | $194k | 4,063k |
kWh
|
$0.085 |
- Natural Gas | $77k | 8.0k |
MMBtu
|
$7.67 |
61
Recommendations
6.8
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $31k | 2.7k |
MMBtu
|
5.4% |
- Electrical | $16k | 262k |
kWh
|
6.5% |
- Natural Gas | $7.5k | - |
MMBtu
|
- |
Waste | $3.8k | |||
Productivity/Other | $24k | |||
TOTAL | $59k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
9
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $386k | 50k |
MMBtu
|
$10.46 |
- Electrical | $194k | 4,063k |
kWh
|
$0.085 |
- Natural Gas | $77k | 8.0k |
MMBtu
|
$7.67 |
28
Implemented Recommendations
3.1
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $14k | 1.9k |
MMBtu
|
3.8% |
- Electrical | $8.6k | 182k |
kWh
|
4.5% |
- Natural Gas | $0.2k | - |
MMBtu
|
- |
Waste | $2.8k | |||
Productivity/Other | $20k | |||
TOTAL | $37k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |