ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Railroad equipment
3+ Characters Required for Products

33

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $594k 105k
MMBtu
$7.29
- Electrical $313k 5,662k
kWh
$0.060
- Natural Gas $149k 47k
MMBtu
$5.33

272

Recommendations

8.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $67k 6.9k
MMBtu
6.6%
- Electrical $38k 678k
kWh
12.0%
- Natural Gas $14k -
MMBtu
-
Waste $7.3k
Productivity/Other $37k
TOTAL $111k
*May be negative reflecting an increased cost component required to save energy and costs overall

29

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $555k 94k
MMBtu
$7.46
- Electrical $283k 5,129k
kWh
$0.061
- Natural Gas $143k 41k
MMBtu
$5.38

102

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $17k 2.3k
MMBtu
2.4%
- Electrical $11k 221k
kWh
4.3%
- Natural Gas $2.6k -
MMBtu
-
Waste $2.4k
Productivity/Other $6.9k
TOTAL $26k