ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Railroad equipment
3+ Characters Required for Products

34

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $590k 104k
MMBtu
$7.29
- Electrical $308k 5,603k
kWh
$0.060
- Natural Gas $149k 46k
MMBtu
$5.37

281

Recommendations

8.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $67k 6.9k
MMBtu
6.6%
- Electrical $37k 671k
kWh
12.0%
- Natural Gas $14k -
MMBtu
-
Waste $7.0k
Productivity/Other $38k
TOTAL $111k
*May be negative reflecting an increased cost component required to save energy and costs overall

30

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $551k 93k
MMBtu
$7.46
- Electrical $278k 5,080k
kWh
$0.060
- Natural Gas $144k 40k
MMBtu
$5.42

105

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $18k 2.3k
MMBtu
2.5%
- Electrical $11k 225k
kWh
4.4%
- Natural Gas $3.4k -
MMBtu
-
Waste $2.4k
Productivity/Other $6.7k
TOTAL $27k