The ITAC Statistics page displays the average assessment results for the selected criteria.
34
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $590k | 104k |
MMBtu
|
$7.29 |
- Electrical | $308k | 5,603k |
kWh
|
$0.060 |
- Natural Gas | $149k | 46k |
MMBtu
|
$5.37 |
281
Recommendations
8.3
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $67k | 6.9k |
MMBtu
|
6.6% |
- Electrical | $37k | 671k |
kWh
|
12.0% |
- Natural Gas | $14k | - |
MMBtu
|
- |
Waste | $7.0k | |||
Productivity/Other | $38k | |||
TOTAL | $111k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
30
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $551k | 93k |
MMBtu
|
$7.46 |
- Electrical | $278k | 5,080k |
kWh
|
$0.060 |
- Natural Gas | $144k | 40k |
MMBtu
|
$5.42 |
105
Implemented Recommendations
3.5
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $18k | 2.3k |
MMBtu
|
2.5% |
- Electrical | $11k | 225k |
kWh
|
4.4% |
- Natural Gas | $3.4k | - |
MMBtu
|
- |
Waste | $2.4k | |||
Productivity/Other | $6.7k | |||
TOTAL | $27k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |