ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Boat building and repairing
3+ Characters Required for Products

1

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $41k 5.8k
MMBtu
$7.01
- Electrical $28k 447k
kWh
$0.062
- Natural Gas $6.3k 1.2k
MMBtu
$5.19

9

Recommendations

9.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $9.4k 1.8k
MMBtu
31.5%
- Electrical $6.4k 178k
kWh
39.8%
- Natural Gas ($-1.6)k -
MMBtu
-
Waste $0.3k
Productivity/Other $45k
TOTAL $55k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $41k 5.8k
MMBtu
$7.01
- Electrical $28k 447k
kWh
$0.062
- Natural Gas $6.3k 1.2k
MMBtu
$5.19

2

Implemented Recommendations

2.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $0.8k 0.1k
MMBtu
1.5%
- Electrical $0.3k 8.5k
kWh
1.9%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $0.5k
TOTAL $1.3k
*May be negative reflecting an increased cost component required to save energy and costs overall