ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Boat building and repairing
3+ Characters Required for Products

74

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $284k 42k
MMBtu
$7.66
- Electrical $166k 2,933k
kWh
$0.064
- Natural Gas $60k 11k
MMBtu
$3.33

562

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $41k 4.4k
MMBtu
10.4%
- Electrical $29k 426k
kWh
14.5%
- Natural Gas $6.8k -
MMBtu
-
Waste $4.9k
Productivity/Other $67k
TOTAL $113k
*May be negative reflecting an increased cost component required to save energy and costs overall

73

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $268k 40k
MMBtu
$7.63
- Electrical $161k 2,872k
kWh
$0.064
- Natural Gas $49k 9.9k
MMBtu
$3.23

270

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $21k 2.5k
MMBtu
6.1%
- Electrical $14k 240k
kWh
8.4%
- Natural Gas $3.6k -
MMBtu
-
Waste $2.7k
Productivity/Other $20k
TOTAL $43k
*May be negative reflecting an increased cost component required to save energy and costs overall