ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Ship building and repairing
3+ Characters Required for Products

39

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $377k 44k
MMBtu
$9.67
- Electrical $328k 4,107k
kWh
$0.084
- Natural Gas $7.2k 1.6k
MMBtu
$2.34

272

Recommendations

7.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $80k 8.8k
MMBtu
19.9%
- Electrical $71k 861k
kWh
21.0%
- Natural Gas $0.5k -
MMBtu
-
Waste $0.0k
Productivity/Other $7.3k
TOTAL $87k
*May be negative reflecting an increased cost component required to save energy and costs overall

35

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $381k 48k
MMBtu
$8.11
- Electrical $337k 4,388k
kWh
$0.074
- Natural Gas $8.0k 1.8k
MMBtu
$2.11

137

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $41k 5.5k
MMBtu
11.6%
- Electrical $39k 537k
kWh
12.2%
- Natural Gas $0.6k -
MMBtu
-
Waste $0.0k
Productivity/Other $2.7k
TOTAL $43k
*May be negative reflecting an increased cost component required to save energy and costs overall