ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Ship building and repairing
3+ Characters Required for Products

33

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $368k 47k
MMBtu
$7.98
- Electrical $326k 4,288k
kWh
$0.073
- Natural Gas $8.5k 1.9k
MMBtu
$2.24

245

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $78k 9.3k
MMBtu
20.0%
- Electrical $74k 911k
kWh
21.2%
- Natural Gas $0.6k -
MMBtu
-
Waste $0.0k
Productivity/Other $5.9k
TOTAL $84k
*May be negative reflecting an increased cost component required to save energy and costs overall

32

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $377k 48k
MMBtu
$7.76
- Electrical $333k 4,403k
kWh
$0.071
- Natural Gas $8.7k 1.9k
MMBtu
$2.31

126

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $36k 5.0k
MMBtu
10.5%
- Electrical $34k 489k
kWh
11.1%
- Natural Gas $0.6k -
MMBtu
-
Waste $0.0k
Productivity/Other $2.9k
TOTAL $39k
*May be negative reflecting an increased cost component required to save energy and costs overall