ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Ship and boat building and repairing
3+ Characters Required for Products

108

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $316k 44k
MMBtu
$7.77
- Electrical $220k 3,410k
kWh
$0.067
- Natural Gas $44k 8.0k
MMBtu
$2.97

811

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $54k 6.1k
MMBtu
13.9%
- Electrical $45k 597k
kWh
17.5%
- Natural Gas $4.9k -
MMBtu
-
Waste $3.3k
Productivity/Other $48k
TOTAL $106k
*May be negative reflecting an increased cost component required to save energy and costs overall

106

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $299k 42k
MMBtu
$7.74
- Electrical $212k 3,313k
kWh
$0.067
- Natural Gas $36k 7.4k
MMBtu
$2.92

397

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 3.2k
MMBtu
7.6%
- Electrical $20k 313k
kWh
9.5%
- Natural Gas $2.7k -
MMBtu
-
Waste $1.8k
Productivity/Other $14k
TOTAL $41k
*May be negative reflecting an increased cost component required to save energy and costs overall