ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Ship and boat building and repairing
3+ Characters Required for Products

107

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $310k 43k
MMBtu
$7.76
- Electrical $215k 3,351k
kWh
$0.067
- Natural Gas $44k 8.0k
MMBtu
$3.00

807

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $52k 5.9k
MMBtu
13.6%
- Electrical $43k 576k
kWh
17.2%
- Natural Gas $4.9k -
MMBtu
-
Waste $3.4k
Productivity/Other $48k
TOTAL $104k
*May be negative reflecting an increased cost component required to save energy and costs overall

104

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $300k 43k
MMBtu
$7.68
- Electrical $215k 3,356k
kWh
$0.066
- Natural Gas $36k 7.2k
MMBtu
$2.95

383

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 3.3k
MMBtu
7.6%
- Electrical $20k 317k
kWh
9.5%
- Natural Gas $2.5k -
MMBtu
-
Waste $1.9k
Productivity/Other $15k
TOTAL $41k
*May be negative reflecting an increased cost component required to save energy and costs overall