ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Aircraft parts and auxiliary equipment, not elsewhere classified
3+ Characters Required for Products

236

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $581k 79k
MMBtu
$8.94
- Electrical $352k 5,871k
kWh
$0.067
- Natural Gas $82k 17k
MMBtu
$5.98

1,720

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $85k 7.5k
MMBtu
9.5%
- Electrical $54k 729k
kWh
12.4%
- Natural Gas $5.4k -
MMBtu
-
Waste $3.0k
Productivity/Other $29k
TOTAL $118k
*May be negative reflecting an increased cost component required to save energy and costs overall

226

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $558k 76k
MMBtu
$8.86
- Electrical $335k 5,679k
kWh
$0.067
- Natural Gas $79k 16k
MMBtu
$5.86

756

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $31k 2.7k
MMBtu
3.5%
- Electrical $19k 262k
kWh
4.6%
- Natural Gas $2.0k -
MMBtu
-
Waste $1.0k
Productivity/Other $14k
TOTAL $46k
*May be negative reflecting an increased cost component required to save energy and costs overall