Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Aircraft parts and auxiliary equipment, not elsewhere classified
3+ Characters Required for Products

244

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $576k 77k
MMBtu
$9.06
- Electrical $349k 5,770k
kWh
$0.068
- Natural Gas $81k 17k
MMBtu
$6.08

1,778

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $87k 7.6k
MMBtu
9.8%
- Electrical $55k 741k
kWh
12.8%
- Natural Gas $5.3k -
MMBtu
-
Waste $2.9k
Productivity/Other $32k
TOTAL $123k
*May be negative reflecting an increased cost component required to save energy and costs overall

230

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $584k 79k
MMBtu
$8.88
- Electrical $355k 5,906k
kWh
$0.067
- Natural Gas $84k 18k
MMBtu
$5.95

775

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $32k 2.8k
MMBtu
3.5%
- Electrical $20k 272k
kWh
4.6%
- Natural Gas $2.1k -
MMBtu
-
Waste $1.0k
Productivity/Other $14k
TOTAL $47k