ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Aircraft parts and auxiliary equipment, not elsewhere classified
3+ Characters Required for Products

230

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $556k 75k
MMBtu
$8.92
- Electrical $333k 5,649k
kWh
$0.067
- Natural Gas $78k 16k
MMBtu
$6.04

1,680

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $84k 7.4k
MMBtu
9.9%
- Electrical $53k 726k
kWh
12.9%
- Natural Gas $3.8k -
MMBtu
-
Waste $3.1k
Productivity/Other $30k
TOTAL $117k
*May be negative reflecting an increased cost component required to save energy and costs overall

216

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $542k 75k
MMBtu
$8.65
- Electrical $320k 5,588k
kWh
$0.066
- Natural Gas $78k 16k
MMBtu
$5.70

717

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $29k 2.6k
MMBtu
3.5%
- Electrical $18k 255k
kWh
4.6%
- Natural Gas $2.1k -
MMBtu
-
Waste $1.1k
Productivity/Other $15k
TOTAL $46k
*May be negative reflecting an increased cost component required to save energy and costs overall