ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Aircraft parts and auxiliary equipment, not elsewhere classified
3+ Characters Required for Products

243

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $577k 78k
MMBtu
$9.05
- Electrical $350k 5,786k
kWh
$0.068
- Natural Gas $81k 17k
MMBtu
$6.06

1,771

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $87k 7.6k
MMBtu
9.8%
- Electrical $55k 739k
kWh
12.8%
- Natural Gas $5.3k -
MMBtu
-
Waste $2.9k
Productivity/Other $33k
TOTAL $123k
*May be negative reflecting an increased cost component required to save energy and costs overall

228

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $587k 80k
MMBtu
$8.86
- Electrical $357k 5,947k
kWh
$0.067
- Natural Gas $84k 18k
MMBtu
$5.88

764

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $31k 2.7k
MMBtu
3.4%
- Electrical $19k 263k
kWh
4.4%
- Natural Gas $2.0k -
MMBtu
-
Waste $1.0k
Productivity/Other $14k
TOTAL $46k
*May be negative reflecting an increased cost component required to save energy and costs overall