ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Aircraft engines and engine parts
3+ Characters Required for Products

83

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $691k 97k
MMBtu
$8.19
- Electrical $437k 8,018k
kWh
$0.33
- Natural Gas $103k 14k
MMBtu
$6.78

594

Recommendations

7.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $71k 8.3k
MMBtu
8.5%
- Electrical $47k 807k
kWh
10.1%
- Natural Gas $12k -
MMBtu
-
Waste $8.2k
Productivity/Other $22k
TOTAL $100k
*May be negative reflecting an increased cost component required to save energy and costs overall

81

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $692k 98k
MMBtu
$8.13
- Electrical $440k 8,043k
kWh
$0.34
- Natural Gas $105k 14k
MMBtu
$6.83

285

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $23k 3.0k
MMBtu
3.1%
- Electrical $17k 295k
kWh
3.7%
- Natural Gas $1.7k -
MMBtu
-
Waste $7.0k
Productivity/Other $18k
TOTAL $48k