Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Aircraft
3+ Characters Required for Products

34

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $590k 71k
MMBtu
$9.33
- Electrical $328k 5,876k
kWh
$0.067
- Natural Gas $75k 11k
MMBtu
$6.67

272

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $131k 13k
MMBtu
17.9%
- Electrical $81k 1,238k
kWh
21.1%
- Natural Gas $5.1k -
MMBtu
-
Waste $2.2k
Productivity/Other $59k
TOTAL $193k
*May be negative reflecting an increased cost component required to save energy and costs overall

30

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $553k 68k
MMBtu
$9.17
- Electrical $322k 5,771k
kWh
$0.065
- Natural Gas $63k 8.6k
MMBtu
$5.60

103

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $30k 3.1k
MMBtu
4.6%
- Electrical $24k 303k
kWh
5.3%
- Natural Gas $1.3k -
MMBtu
-
Waste $0.7k
Productivity/Other $13k
TOTAL $44k
*May be negative reflecting an increased cost component required to save energy and costs overall