ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Aircraft and parts
3+ Characters Required for Products

350

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $601k 82k
MMBtu
$8.71
- Electrical $367k 6,362k
kWh
$0.13
- Natural Gas $85k 16k
MMBtu
$6.10

2,562

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $82k 7.8k
MMBtu
9.5%
- Electrical $53k 763k
kWh
12.0%
- Natural Gas $7.0k -
MMBtu
-
Waste $4.2k
Productivity/Other $28k
TOTAL $114k
*May be negative reflecting an increased cost component required to save energy and costs overall

335

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $587k 81k
MMBtu
$8.60
- Electrical $358k 6,267k
kWh
$0.13
- Natural Gas $84k 15k
MMBtu
$6.03

1,136

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $29k 2.8k
MMBtu
3.5%
- Electrical $19k 272k
kWh
4.3%
- Natural Gas $1.9k -
MMBtu
-
Waste $2.4k
Productivity/Other $15k
TOTAL $46k
*May be negative reflecting an increased cost component required to save energy and costs overall