ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Aircraft and parts
3+ Characters Required for Products

343

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $585k 80k
MMBtu
$8.70
- Electrical $355k 6,226k
kWh
$0.13
- Natural Gas $83k 15k
MMBtu
$6.13

2,512

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $80k 7.7k
MMBtu
9.7%
- Electrical $52k 756k
kWh
12.2%
- Natural Gas $6.0k -
MMBtu
-
Waste $4.3k
Productivity/Other $29k
TOTAL $114k
*May be negative reflecting an increased cost component required to save energy and costs overall

324

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $579k 80k
MMBtu
$8.44
- Electrical $349k 6,241k
kWh
$0.13
- Natural Gas $84k 15k
MMBtu
$5.91

1,094

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $28k 2.7k
MMBtu
3.4%
- Electrical $18k 268k
kWh
4.3%
- Natural Gas $1.9k -
MMBtu
-
Waste $2.5k
Productivity/Other $16k
TOTAL $46k
*May be negative reflecting an increased cost component required to save energy and costs overall