ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Aircraft and parts
3+ Characters Required for Products

345

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $604k 83k
MMBtu
$8.71
- Electrical $369k 6,403k
kWh
$0.13
- Natural Gas $86k 16k
MMBtu
$6.11

2,528

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $82k 7.8k
MMBtu
9.4%
- Electrical $53k 760k
kWh
11.9%
- Natural Gas $6.9k -
MMBtu
-
Waste $4.3k
Productivity/Other $29k
TOTAL $115k
*May be negative reflecting an increased cost component required to save energy and costs overall

333

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $584k 80k
MMBtu
$8.59
- Electrical $354k 6,246k
kWh
$0.13
- Natural Gas $83k 15k
MMBtu
$6.01

1,131

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $29k 2.8k
MMBtu
3.5%
- Electrical $19k 274k
kWh
4.4%
- Natural Gas $1.9k -
MMBtu
-
Waste $2.5k
Productivity/Other $15k
TOTAL $47k