ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Motor homes
3+ Characters Required for Products

9

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $602k 82k
MMBtu
$7.56
- Electrical $285k 5,008k
kWh
$0.058
- Natural Gas $260k 30k
MMBtu
$6.60

86

Recommendations

9.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $53k 5.0k
MMBtu
6.2%
- Electrical $22k 490k
kWh
9.8%
- Natural Gas $18k -
MMBtu
-
Waste $2.1k
Productivity/Other $6.5k
TOTAL $62k
*May be negative reflecting an increased cost component required to save energy and costs overall

9

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $602k 82k
MMBtu
$7.56
- Electrical $285k 5,008k
kWh
$0.058
- Natural Gas $260k 30k
MMBtu
$6.60

46

Implemented Recommendations

5.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $32k 3.9k
MMBtu
4.8%
- Electrical $13k 383k
kWh
7.7%
- Natural Gas $7.5k -
MMBtu
-
Waste $2.1k
Productivity/Other $2.8k
TOTAL $37k
*May be negative reflecting an increased cost component required to save energy and costs overall