ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Motor vehicle parts and accessories
3+ Characters Required for Products

516

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $902k 158k
MMBtu
$6.99
- Electrical $536k 11,437k
kWh
$0.055
- Natural Gas $153k 29k
MMBtu
$6.22

4,089

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $103k 12k
MMBtu
7.7%
- Electrical $61k 1,193k
kWh
10.4%
- Natural Gas $17k -
MMBtu
-
Waste $12k
Productivity/Other $39k
TOTAL $155k
*May be negative reflecting an increased cost component required to save energy and costs overall

484

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $879k 156k
MMBtu
$6.90
- Electrical $522k 11,343k
kWh
$0.054
- Natural Gas $150k 29k
MMBtu
$6.14

1,792

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $35k 5.1k
MMBtu
3.3%
- Electrical $22k 497k
kWh
4.4%
- Natural Gas $5.9k -
MMBtu
-
Waste $2.6k
Productivity/Other $16k
TOTAL $53k
*May be negative reflecting an increased cost component required to save energy and costs overall