ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Transportation equipment
3+ Characters Required for Products

1,063

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $720k 118k
MMBtu
$7.27
- Electrical $432k 8,707k
kWh
$0.080
- Natural Gas $141k 27k
MMBtu
$5.60

8,240

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $82k 8.9k
MMBtu
7.5%
- Electrical $47k 867k
kWh
10.0%
- Natural Gas $13k -
MMBtu
-
Waste $9.1k
Productivity/Other $44k
TOTAL $135k
*May be negative reflecting an increased cost component required to save energy and costs overall

1,054

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $720k 118k
MMBtu
$7.27
- Electrical $431k 8,698k
kWh
$0.080
- Natural Gas $142k 27k
MMBtu
$5.60

3,812

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $31k 3.8k
MMBtu
3.2%
- Electrical $19k 370k
kWh
4.3%
- Natural Gas $4.4k -
MMBtu
-
Waste $3.2k
Productivity/Other $16k
TOTAL $50k
*May be negative reflecting an increased cost component required to save energy and costs overall