ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Transportation equipment
3+ Characters Required for Products

1,279

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $765k 124k
MMBtu
$7.74
- Electrical $456k 8,809k
kWh
$0.078
- Natural Gas $145k 27k
MMBtu
$5.86

9,839

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $94k 10k
MMBtu
8.2%
- Electrical $58k 986k
kWh
11.2%
- Natural Gas $13k -
MMBtu
-
Waste $8.1k
Productivity/Other $42k
TOTAL $143k
*May be negative reflecting an increased cost component required to save energy and costs overall

1,224

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $754k 123k
MMBtu
$7.65
- Electrical $450k 8,745k
kWh
$0.079
- Natural Gas $144k 27k
MMBtu
$5.80

4,396

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $33k 3.9k
MMBtu
3.2%
- Electrical $20k 380k
kWh
4.3%
- Natural Gas $4.4k -
MMBtu
-
Waste $3.0k
Productivity/Other $15k
TOTAL $50k
*May be negative reflecting an increased cost component required to save energy and costs overall