ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Electrical machinery, equipment, and supplies, not elsewhere
3+ Characters Required for Products

1

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $217k 34k
MMBtu
$6.44
- Electrical $162k 1,707k
kWh
$0.095
- Natural Gas $55k 16k
MMBtu
$3.41

10

Recommendations

10.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $33k 1.0k
MMBtu
3.1%
- Electrical $9.7k 102k
kWh
6.0%
- Natural Gas $23k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $33k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $217k 34k
MMBtu
$6.44
- Electrical $162k 1,707k
kWh
$0.095
- Natural Gas $55k 16k
MMBtu
$3.41

10

Implemented Recommendations

10.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $33k 1.0k
MMBtu
3.1%
- Electrical $9.7k 102k
kWh
6.0%
- Natural Gas $23k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $33k
*May be negative reflecting an increased cost component required to save energy and costs overall