ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Magnetic and optical recording media
3+ Characters Required for Products

9

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $419k 88k
MMBtu
$5.68
- Electrical $376k 7,656k
kWh
$0.054
- Natural Gas $23k 9.1k
MMBtu
$2.56

72

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $32k 5.4k
MMBtu
6.2%
- Electrical $30k 527k
kWh
6.9%
- Natural Gas $0.4k -
MMBtu
-
Waste $38k
Productivity/Other $69k
TOTAL $139k
*May be negative reflecting an increased cost component required to save energy and costs overall

9

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $419k 88k
MMBtu
$5.68
- Electrical $376k 7,656k
kWh
$0.054
- Natural Gas $23k 9.1k
MMBtu
$2.56

9

Implemented Recommendations

1.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $4.4k 0.5k
MMBtu
0.6%
- Electrical $2.9k 52k
kWh
0.7%
- Natural Gas $1.5k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $4.4k