ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Electrical equipment for internal combustion engines
3+ Characters Required for Products

3

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $234k 36k
MMBtu
$6.90
- Electrical $205k 2,804k
kWh
$0.085
- Natural Gas $29k 7.4k
MMBtu
$4.13

24

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $20k 1.8k
MMBtu
5.0%
- Electrical $11k 175k
kWh
6.3%
- Natural Gas $8.9k -
MMBtu
-
Waste -
Productivity/Other $1.9k
TOTAL $22k
*May be negative reflecting an increased cost component required to save energy and costs overall

3

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $234k 36k
MMBtu
$6.90
- Electrical $205k 2,804k
kWh
$0.085
- Natural Gas $29k 7.4k
MMBtu
$4.13

9

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $5.7k 0.3k
MMBtu
0.7%
- Electrical $1.7k 25k
kWh
0.9%
- Natural Gas $3.9k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $5.7k
*May be negative reflecting an increased cost component required to save energy and costs overall