ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Primary batteries, dry and wet
3+ Characters Required for Products

19

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $903k 165k
MMBtu
$6.09
- Electrical $581k 12,775k
kWh
$0.051
- Natural Gas $104k 24k
MMBtu
$3.85

136

Recommendations

7.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $107k 14k
MMBtu
8.4%
- Electrical $75k 1,343k
kWh
10.5%
- Natural Gas $10k -
MMBtu
-
Waste $7.0k
Productivity/Other $54k
TOTAL $168k
*May be negative reflecting an increased cost component required to save energy and costs overall

19

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $903k 165k
MMBtu
$6.09
- Electrical $581k 12,775k
kWh
$0.051
- Natural Gas $104k 24k
MMBtu
$3.85

65

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 2.0k
MMBtu
1.2%
- Electrical $13k 198k
kWh
1.5%
- Natural Gas $3.2k -
MMBtu
-
Waste $5.3k
Productivity/Other $48k
TOTAL $78k
*May be negative reflecting an increased cost component required to save energy and costs overall