ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Storage batteries
3+ Characters Required for Products

39

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,512k 240k
MMBtu
$7.83
- Electrical $914k 18,589k
kWh
$0.069
- Natural Gas $238k 49k
MMBtu
$6.00

285

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $192k 22k
MMBtu
9.2%
- Electrical $125k 2,150k
kWh
11.6%
- Natural Gas $33k -
MMBtu
-
Waste $9.5k
Productivity/Other $48k
TOTAL $250k
*May be negative reflecting an increased cost component required to save energy and costs overall

37

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,443k 243k
MMBtu
$7.46
- Electrical $870k 18,896k
kWh
$0.065
- Natural Gas $229k 49k
MMBtu
$5.68

127

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $39k 6.3k
MMBtu
2.6%
- Electrical $33k 616k
kWh
3.3%
- Natural Gas $0.4k -
MMBtu
-
Waste $6.8k
Productivity/Other $10k
TOTAL $56k
*May be negative reflecting an increased cost component required to save energy and costs overall