ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous electrical machinery, equipment, and supplies
3+ Characters Required for Products

142

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $860k 139k
MMBtu
$7.60
- Electrical $563k 11,038k
kWh
$0.063
- Natural Gas $120k 24k
MMBtu
$4.77

1,052

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $104k 12k
MMBtu
8.8%
- Electrical $69k 1,193k
kWh
10.8%
- Natural Gas $17k -
MMBtu
-
Waste $6.2k
Productivity/Other $41k
TOTAL $152k
*May be negative reflecting an increased cost component required to save energy and costs overall

134

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $848k 143k
MMBtu
$7.06
- Electrical $557k 11,292k
kWh
$0.061
- Natural Gas $119k 25k
MMBtu
$4.51

437

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $23k 3.1k
MMBtu
2.2%
- Electrical $17k 306k
kWh
2.7%
- Natural Gas $2.2k -
MMBtu
-
Waste $2.7k
Productivity/Other $18k
TOTAL $44k