ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Electronic connectors
3+ Characters Required for Products

31

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $440k 65k
MMBtu
$9.42
- Electrical $355k 5,602k
kWh
$0.079
- Natural Gas $36k 7.4k
MMBtu
$5.93

223

Recommendations

7.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $61k 7.5k
MMBtu
11.6%
- Electrical $54k 732k
kWh
13.1%
- Natural Gas $0.2k -
MMBtu
-
Waste $1.6k
Productivity/Other $20k
TOTAL $83k
*May be negative reflecting an increased cost component required to save energy and costs overall

29

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $445k 66k
MMBtu
$9.45
- Electrical $359k 5,718k
kWh
$0.079
- Natural Gas $37k 7.7k
MMBtu
$6.10

112

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $28k 4.5k
MMBtu
6.8%
- Electrical $27k 440k
kWh
7.7%
- Natural Gas ($-0.4)k -
MMBtu
-
Waste $1.2k
Productivity/Other $11k
TOTAL $40k
*May be negative reflecting an increased cost component required to save energy and costs overall