ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Electronic connectors
3+ Characters Required for Products

29

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $445k 66k
MMBtu
$9.45
- Electrical $359k 5,718k
kWh
$0.079
- Natural Gas $37k 7.7k
MMBtu
$6.10

212

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $57k 7.0k
MMBtu
10.6%
- Electrical $51k 688k
kWh
12.0%
- Natural Gas $0.1k -
MMBtu
-
Waste $1.7k
Productivity/Other $21k
TOTAL $80k
*May be negative reflecting an increased cost component required to save energy and costs overall

25

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $465k 72k
MMBtu
$7.85
- Electrical $380k 6,139k
kWh
$0.068
- Natural Gas $41k 8.7k
MMBtu
$4.98

90

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $19k 2.3k
MMBtu
3.2%
- Electrical $15k 227k
kWh
3.7%
- Natural Gas $2.1k -
MMBtu
-
Waste -
Productivity/Other $5.1k
TOTAL $24k
*May be negative reflecting an increased cost component required to save energy and costs overall