ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Semiconductors and related devices
3+ Characters Required for Products

85

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,073k 169k
MMBtu
$7.98
- Electrical $743k 14,645k
kWh
$0.066
- Natural Gas $128k 18k
MMBtu
$6.96

623

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $107k 11k
MMBtu
6.6%
- Electrical $68k 1,086k
kWh
7.4%
- Natural Gas $17k -
MMBtu
-
Waste $4.2k
Productivity/Other $84k
TOTAL $195k
*May be negative reflecting an increased cost component required to save energy and costs overall

79

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,093k 174k
MMBtu
$7.88
- Electrical $752k 15,088k
kWh
$0.065
- Natural Gas $132k 19k
MMBtu
$6.99

249

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $24k 2.7k
MMBtu
1.6%
- Electrical $17k 268k
kWh
1.8%
- Natural Gas $4.2k -
MMBtu
-
Waste $2.2k
Productivity/Other $8.5k
TOTAL $35k
*May be negative reflecting an increased cost component required to save energy and costs overall