ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Printed circuit boards
3+ Characters Required for Products

116

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $473k 158k
MMBtu
$7.74
- Electrical $339k 5,933k
kWh
$0.068
- Natural Gas $40k 9.8k
MMBtu
$5.15

889

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $54k 6.1k
MMBtu
3.9%
- Electrical $43k 596k
kWh
10.0%
- Natural Gas $1.6k -
MMBtu
-
Waste $7.7k
Productivity/Other $37k
TOTAL $99k
*May be negative reflecting an increased cost component required to save energy and costs overall

113

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $464k 160k
MMBtu
$7.51
- Electrical $334k 5,947k
kWh
$0.065
- Natural Gas $41k 9.5k
MMBtu
$5.10

394

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $22k 2.5k
MMBtu
1.5%
- Electrical $15k 241k
kWh
4.1%
- Natural Gas $2.2k -
MMBtu
-
Waste $1.3k
Productivity/Other $22k
TOTAL $45k
*May be negative reflecting an increased cost component required to save energy and costs overall