ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Printed circuit boards
3+ Characters Required for Products

109

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $468k 164k
MMBtu
$7.47
- Electrical $338k 5,977k
kWh
$0.065
- Natural Gas $41k 9.7k
MMBtu
$4.78

844

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $51k 6.1k
MMBtu
3.8%
- Electrical $41k 600k
kWh
10.0%
- Natural Gas $1.4k -
MMBtu
-
Waste $8.2k
Productivity/Other $35k
TOTAL $94k
*May be negative reflecting an increased cost component required to save energy and costs overall

106

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $471k 167k
MMBtu
$7.37
- Electrical $339k 6,052k
kWh
$0.064
- Natural Gas $41k 9.9k
MMBtu
$4.74

367

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $21k 2.5k
MMBtu
1.5%
- Electrical $16k 247k
kWh
4.1%
- Natural Gas $2.1k -
MMBtu
-
Waste $1.4k
Productivity/Other $19k
TOTAL $41k
*May be negative reflecting an increased cost component required to save energy and costs overall