Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Electron tubes
3+ Characters Required for Products

5

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $646k 73k
MMBtu
$12.09
- Electrical $557k 6,546k
kWh
$0.11
- Natural Gas $47k 6.0k
MMBtu
$2.99

36

Recommendations

7.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $110k 7.3k
MMBtu
10.0%
- Electrical $100k 712k
kWh
10.9%
- Natural Gas $9.1k -
MMBtu
-
Waste $9.5k
Productivity/Other $31k
TOTAL $150k
*May be negative reflecting an increased cost component required to save energy and costs overall

5

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $646k 73k
MMBtu
$12.09
- Electrical $557k 6,546k
kWh
$0.11
- Natural Gas $47k 6.0k
MMBtu
$2.99

16

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $44k 2.5k
MMBtu
3.5%
- Electrical $39k 248k
kWh
3.8%
- Natural Gas $4.6k -
MMBtu
-
Waste -
Productivity/Other $12k
TOTAL $56k