The ITAC Statistics page displays the average assessment results for the selected criteria.
438
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $576k | 111k |
MMBtu
|
$8.34 |
- Electrical | $407k | 7,565k |
kWh
|
$0.068 |
- Natural Gas | $58k | 9.9k |
MMBtu
|
$5.55 |
3,235
Recommendations
7.4
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $72k | 10k |
MMBtu
|
9.4% |
- Electrical | $60k | 1,016k |
kWh
|
13.4% |
- Natural Gas | ($-2.4)k | - |
MMBtu
|
- |
Waste | $4.2k | |||
Productivity/Other | $58k | |||
TOTAL | $134k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
414
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $575k | 114k |
MMBtu
|
$8.01 |
- Electrical | $407k | 7,730k |
kWh
|
$0.066 |
- Natural Gas | $55k | 9.9k |
MMBtu
|
$5.35 |
1,411
Implemented Recommendations
3.4
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $29k | 3.7k |
MMBtu
|
3.2% |
- Electrical | $24k | 357k |
kWh
|
4.6% |
- Natural Gas | $2.4k | - |
MMBtu
|
- |
Waste | $1.2k | |||
Productivity/Other | $24k | |||
TOTAL | $55k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |