The ITAC Statistics page displays the average assessment results for the selected criteria.
447
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $571k | 110k |
MMBtu
|
$8.40 |
- Electrical | $405k | 7,487k |
kWh
|
$0.069 |
- Natural Gas | $57k | 9.9k |
MMBtu
|
$5.61 |
3,297
Recommendations
7.4
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $74k | 10k |
MMBtu
|
9.4% |
- Electrical | $61k | 1,009k |
kWh
|
13.5% |
- Natural Gas | ($-2.2)k | - |
MMBtu
|
- |
Waste | $4.1k | |||
Productivity/Other | $57k | |||
TOTAL | $135k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
430
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $576k | 112k |
MMBtu
|
$8.25 |
- Electrical | $407k | 7,598k |
kWh
|
$0.067 |
- Natural Gas | $57k | 9.9k |
MMBtu
|
$5.49 |
1,466
Implemented Recommendations
3.4
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $30k | 3.7k |
MMBtu
|
3.4% |
- Electrical | $24k | 366k |
kWh
|
4.8% |
- Natural Gas | $2.2k | - |
MMBtu
|
- |
Waste | $1.2k | |||
Productivity/Other | $25k | |||
TOTAL | $57k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |