ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Communications equipment, not elsewhere classified
3+ Characters Required for Products

15

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $397k 58k
MMBtu
$7.34
- Electrical $289k 5,334k
kWh
$0.066
- Natural Gas $14k 2.9k
MMBtu
$3.76

106

Recommendations

7.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $24k 3.0k
MMBtu
5.1%
- Electrical $21k 288k
kWh
5.4%
- Natural Gas $0.5k -
MMBtu
-
Waste $12k
Productivity/Other $15k
TOTAL $51k
*May be negative reflecting an increased cost component required to save energy and costs overall

14

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $416k 62k
MMBtu
$7.16
- Electrical $303k 5,619k
kWh
$0.067
- Natural Gas $15k 3.1k
MMBtu
$4.03

43

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $9.3k 1.3k
MMBtu
2.2%
- Electrical $8.4k 132k
kWh
2.3%
- Natural Gas -
-
MMBtu
-
Waste $5.3k
Productivity/Other $1.4k
TOTAL $16k