ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Household audio and video equipment
3+ Characters Required for Products

18

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $289k 41k
MMBtu
$8.89
- Electrical $174k 3,232k
kWh
$0.076
- Natural Gas $54k 8.0k
MMBtu
$6.72

118

Recommendations

6.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $78k 3.6k
MMBtu
8.8%
- Electrical $34k 356k
kWh
11.0%
- Natural Gas $39k -
MMBtu
-
Waste $0.7k
Productivity/Other $37k
TOTAL $116k
*May be negative reflecting an increased cost component required to save energy and costs overall

18

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $289k 41k
MMBtu
$8.89
- Electrical $174k 3,232k
kWh
$0.076
- Natural Gas $54k 8.0k
MMBtu
$6.72

44

Implemented Recommendations

2.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $14k 0.9k
MMBtu
2.2%
- Electrical $9.0k 88k
kWh
2.7%
- Natural Gas $3.6k -
MMBtu
-
Waste -
Productivity/Other $0.2k
TOTAL $14k
*May be negative reflecting an increased cost component required to save energy and costs overall