Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Lighting equipment, not elsewhere classified
3+ Characters Required for Products

14

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $303k 49k
MMBtu
$7.66
- Electrical $210k 3,285k
kWh
$0.066
- Natural Gas $66k 15k
MMBtu
$5.48

108

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $34k 2.8k
MMBtu
5.7%
- Electrical $21k 277k
kWh
8.4%
- Natural Gas $3.6k -
MMBtu
-
Waste $8.7k
Productivity/Other $14k
TOTAL $57k
*May be negative reflecting an increased cost component required to save energy and costs overall

14

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $303k 49k
MMBtu
$7.66
- Electrical $210k 3,285k
kWh
$0.066
- Natural Gas $66k 15k
MMBtu
$5.48

61

Implemented Recommendations

4.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $14k 1.2k
MMBtu
2.5%
- Electrical $6.6k 118k
kWh
3.6%
- Natural Gas $2.3k -
MMBtu
-
Waste $3.9k
Productivity/Other $3.4k
TOTAL $22k