ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Lighting equipment, not elsewhere classified
3+ Characters Required for Products

1

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $588k 115k
MMBtu
$5.12
- Electrical $396k 5,691k
kWh
$0.070
- Natural Gas $192k 57k
MMBtu
$3.39

12

Recommendations

12.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $61k 2.1k
MMBtu
1.8%
- Electrical $45k 207k
kWh
3.6%
- Natural Gas $16k -
MMBtu
-
Waste $10k
Productivity/Other -
TOTAL $72k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $588k 115k
MMBtu
$5.12
- Electrical $396k 5,691k
kWh
$0.070
- Natural Gas $192k 57k
MMBtu
$3.39

5

Implemented Recommendations

5.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $19k 0.5k
MMBtu
0.5%
- Electrical $3.7k 53k
kWh
0.9%
- Natural Gas $15k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $19k
*May be negative reflecting an increased cost component required to save energy and costs overall