ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Residential electric lighting fixtures
3+ Characters Required for Products

21

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $460k 69k
MMBtu
$8.50
- Electrical $163k 4,147k
kWh
$0.068
- Natural Gas $214k 26k
MMBtu
$6.16

180

Recommendations

8.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $83k 5.7k
MMBtu
8.3%
- Electrical $32k 559k
kWh
13.5%
- Natural Gas $41k -
MMBtu
-
Waste $6.9k
Productivity/Other $107k
TOTAL $197k
*May be negative reflecting an increased cost component required to save energy and costs overall

20

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $474k 72k
MMBtu
$7.51
- Electrical $169k 4,330k
kWh
$0.065
- Natural Gas $224k 27k
MMBtu
$5.69

79

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $11k 1.7k
MMBtu
2.4%
- Electrical $5.5k 166k
kWh
3.8%
- Natural Gas $2.1k -
MMBtu
-
Waste $1.9k
Productivity/Other $99k
TOTAL $113k
*May be negative reflecting an increased cost component required to save energy and costs overall