ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Residential electric lighting fixtures
3+ Characters Required for Products

2

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $278k 46k
MMBtu
$5.60
- Electrical $70k 1,539k
kWh
$0.062
- Natural Gas $115k 31k
MMBtu
$3.90

17

Recommendations

8.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $27k 2.1k
MMBtu
4.5%
- Electrical $10k 205k
kWh
13.3%
- Natural Gas $5.3k -
MMBtu
-
Waste $3.8k
Productivity/Other $78k
TOTAL $108k
*May be negative reflecting an increased cost component required to save energy and costs overall

2

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $278k 46k
MMBtu
$5.60
- Electrical $70k 1,539k
kWh
$0.062
- Natural Gas $115k 31k
MMBtu
$3.90

6

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $8.6k 0.6k
MMBtu
1.2%
- Electrical $2.8k 55k
kWh
3.6%
- Natural Gas $3.8k -
MMBtu
-
Waste $3.8k
Productivity/Other $60k
TOTAL $72k
*May be negative reflecting an increased cost component required to save energy and costs overall