ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Noncurrent-carrying wiring devices
3+ Characters Required for Products

18

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $888k 179k
MMBtu
$7.06
- Electrical $525k 8,790k
kWh
$0.066
- Natural Gas $265k 89k
MMBtu
$6.86

142

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $60k 6.0k
MMBtu
3.3%
- Electrical $36k 583k
kWh
6.6%
- Natural Gas $16k -
MMBtu
-
Waste $3.2k
Productivity/Other $58k
TOTAL $121k
*May be negative reflecting an increased cost component required to save energy and costs overall

17

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $897k 184k
MMBtu
$7.02
- Electrical $524k 8,791k
kWh
$0.066
- Natural Gas $278k 94k
MMBtu
$6.74

69

Implemented Recommendations

4.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $30k 3.3k
MMBtu
1.8%
- Electrical $23k 318k
kWh
3.6%
- Natural Gas $4.5k -
MMBtu
-
Waste $0.1k
Productivity/Other $51k
TOTAL $81k
*May be negative reflecting an increased cost component required to save energy and costs overall