ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Current-carrying wiring devices
3+ Characters Required for Products

63

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $354k 48k
MMBtu
$8.20
- Electrical $234k 3,994k
kWh
$0.065
- Natural Gas $45k 7.2k
MMBtu
$5.29

447

Recommendations

7.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $39k 4.8k
MMBtu
10.0%
- Electrical $32k 470k
kWh
11.8%
- Natural Gas $1.8k -
MMBtu
-
Waste $1.6k
Productivity/Other $23k
TOTAL $63k
*May be negative reflecting an increased cost component required to save energy and costs overall

61

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $358k 50k
MMBtu
$7.85
- Electrical $239k 4,101k
kWh
$0.063
- Natural Gas $46k 7.4k
MMBtu
$5.13

222

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $16k 1.9k
MMBtu
3.8%
- Electrical $13k 185k
kWh
4.5%
- Natural Gas $1.5k -
MMBtu
-
Waste $0.1k
Productivity/Other $15k
TOTAL $32k
*May be negative reflecting an increased cost component required to save energy and costs overall