ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Electric lamp bulbs and tubes
3+ Characters Required for Products

16

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $431k 78k
MMBtu
$7.94
- Electrical $291k 5,008k
kWh
$0.065
- Natural Gas $89k 25k
MMBtu
$4.62

96

Recommendations

6.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $37k 4.5k
MMBtu
5.9%
- Electrical $26k 443k
kWh
8.8%
- Natural Gas $4.1k -
MMBtu
-
Waste $0.8k
Productivity/Other $2.0k
TOTAL $40k
*May be negative reflecting an increased cost component required to save energy and costs overall

16

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $431k 78k
MMBtu
$7.94
- Electrical $291k 5,008k
kWh
$0.065
- Natural Gas $89k 25k
MMBtu
$4.62

47

Implemented Recommendations

2.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $11k 1.3k
MMBtu
1.7%
- Electrical $7.7k 130k
kWh
2.6%
- Natural Gas $0.9k -
MMBtu
-
Waste $0.3k
Productivity/Other $0.1k
TOTAL $12k
*May be negative reflecting an increased cost component required to save energy and costs overall