ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Electric lighting and wiring equipment
3+ Characters Required for Products

176

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $455k 71k
MMBtu
$7.96
- Electrical $273k 4,716k
kWh
$0.067
- Natural Gas $105k 22k
MMBtu
$5.63

1,281

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $47k 4.7k
MMBtu
6.7%
- Electrical $30k 463k
kWh
9.8%
- Natural Gas $10k -
MMBtu
-
Waste $2.7k
Productivity/Other $34k
TOTAL $84k
*May be negative reflecting an increased cost component required to save energy and costs overall

170

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $461k 72k
MMBtu
$7.74
- Electrical $276k 4,797k
kWh
$0.065
- Natural Gas $109k 23k
MMBtu
$5.51

630

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $18k 2.0k
MMBtu
2.8%
- Electrical $13k 197k
kWh
4.1%
- Natural Gas $2.2k -
MMBtu
-
Waste $0.6k
Productivity/Other $25k
TOTAL $44k
*May be negative reflecting an increased cost component required to save energy and costs overall