ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Electric lighting and wiring equipment
3+ Characters Required for Products

177

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $459k 71k
MMBtu
$8.07
- Electrical $274k 4,733k
kWh
$0.067
- Natural Gas $106k 22k
MMBtu
$5.62

1,284

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $47k 4.7k
MMBtu
6.7%
- Electrical $30k 462k
kWh
9.8%
- Natural Gas $10.0k -
MMBtu
-
Waste $2.7k
Productivity/Other $34k
TOTAL $83k
*May be negative reflecting an increased cost component required to save energy and costs overall

172

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $458k 71k
MMBtu
$7.87
- Electrical $274k 4,750k
kWh
$0.066
- Natural Gas $107k 22k
MMBtu
$5.57

630

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $18k 2.0k
MMBtu
2.8%
- Electrical $13k 195k
kWh
4.1%
- Natural Gas $2.1k -
MMBtu
-
Waste $0.6k
Productivity/Other $25k
TOTAL $43k
*May be negative reflecting an increased cost component required to save energy and costs overall