ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Household laundry equipment
3+ Characters Required for Products

6

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,590k 274k
MMBtu
$5.47
- Electrical $652k 18,633k
kWh
$0.038
- Natural Gas $240k 83k
MMBtu
$4.62

42

Recommendations

7.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $145k 17k
MMBtu
6.1%
- Electrical $55k 1,628k
kWh
8.7%
- Natural Gas $27k -
MMBtu
-
Waste $3.3k
Productivity/Other $66k
TOTAL $214k
*May be negative reflecting an increased cost component required to save energy and costs overall

6

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,590k 274k
MMBtu
$5.47
- Electrical $652k 18,633k
kWh
$0.038
- Natural Gas $240k 83k
MMBtu
$4.62

25

Implemented Recommendations

4.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $53k 4.8k
MMBtu
1.8%
- Electrical $17k 470k
kWh
2.5%
- Natural Gas $23k -
MMBtu
-
Waste $0.0k
Productivity/Other $20k
TOTAL $73k
*May be negative reflecting an increased cost component required to save energy and costs overall