ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Household appliances
3+ Characters Required for Products

55

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $730k 130k
MMBtu
$5.79
- Electrical $347k 8,479k
kWh
$0.050
- Natural Gas $184k 43k
MMBtu
$4.69

409

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $64k 8.0k
MMBtu
6.2%
- Electrical $30k 781k
kWh
9.2%
- Natural Gas $9.0k -
MMBtu
-
Waste $4.9k
Productivity/Other $57k
TOTAL $126k
*May be negative reflecting an increased cost component required to save energy and costs overall

54

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $737k 132k
MMBtu
$5.65
- Electrical $349k 8,592k
kWh
$0.049
- Natural Gas $187k 44k
MMBtu
$4.78

208

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 4.1k
MMBtu
3.1%
- Electrical $18k 405k
kWh
4.7%
- Natural Gas $3.0k -
MMBtu
-
Waste $3.2k
Productivity/Other $12k
TOTAL $40k
*May be negative reflecting an increased cost component required to save energy and costs overall