ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Household appliances
3+ Characters Required for Products

54

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $737k 132k
MMBtu
$5.65
- Electrical $349k 8,592k
kWh
$0.049
- Natural Gas $187k 44k
MMBtu
$4.78

403

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $64k 8.1k
MMBtu
6.1%
- Electrical $30k 789k
kWh
9.2%
- Natural Gas $9.1k -
MMBtu
-
Waste $5.0k
Productivity/Other $58k
TOTAL $127k
*May be negative reflecting an increased cost component required to save energy and costs overall

52

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $627k 116k
MMBtu
$5.61
- Electrical $314k 7,937k
kWh
$0.049
- Natural Gas $138k 34k
MMBtu
$4.76

197

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $24k 4.1k
MMBtu
3.5%
- Electrical $17k 398k
kWh
5.0%
- Natural Gas $3.2k -
MMBtu
-
Waste $2.3k
Productivity/Other $13k
TOTAL $40k
*May be negative reflecting an increased cost component required to save energy and costs overall