ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Relays and industrial controls
3+ Characters Required for Products

47

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $289k 40k
MMBtu
$8.09
- Electrical $190k 3,295k
kWh
$0.065
- Natural Gas $34k 6.4k
MMBtu
$5.94

346

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $31k 3.6k
MMBtu
8.8%
- Electrical $20k 349k
kWh
10.6%
- Natural Gas $2.8k -
MMBtu
-
Waste $1.2k
Productivity/Other $2.9k
TOTAL $36k
*May be negative reflecting an increased cost component required to save energy and costs overall

46

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $254k 39k
MMBtu
$7.84
- Electrical $169k 3,164k
kWh
$0.064
- Natural Gas $35k 6.5k
MMBtu
$6.07

146

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $13k 1.5k
MMBtu
3.9%
- Electrical $7.7k 151k
kWh
4.8%
- Natural Gas $2.1k -
MMBtu
-
Waste $0.3k
Productivity/Other $0.4k
TOTAL $13k
*May be negative reflecting an increased cost component required to save energy and costs overall