ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Carbon and graphite products
3+ Characters Required for Products

29

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,663k 313k
MMBtu
$6.51
- Electrical $694k 16,451k
kWh
$0.050
- Natural Gas $600k 105k
MMBtu
$5.05

238

Recommendations

8.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $219k 16k
MMBtu
5.1%
- Electrical $67k 1,553k
kWh
9.4%
- Natural Gas $137k -
MMBtu
-
Waste $14k
Productivity/Other $48k
TOTAL $281k
*May be negative reflecting an increased cost component required to save energy and costs overall

27

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,551k 306k
MMBtu
$6.45
- Electrical $685k 16,127k
kWh
$0.051
- Natural Gas $552k 98k
MMBtu
$4.98

89

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $36k 4.4k
MMBtu
1.4%
- Electrical $18k 425k
kWh
2.6%
- Natural Gas $14k -
MMBtu
-
Waste $2.5k
Productivity/Other $3.8k
TOTAL $42k
*May be negative reflecting an increased cost component required to save energy and costs overall