ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Electrical industrial apparatus
3+ Characters Required for Products

176

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $546k 90k
MMBtu
$7.47
- Electrical $312k 6,285k
kWh
$0.062
- Natural Gas $136k 25k
MMBtu
$5.50

1,337

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $70k 6.8k
MMBtu
7.6%
- Electrical $36k 663k
kWh
10.6%
- Natural Gas $25k -
MMBtu
-
Waste $2.8k
Productivity/Other $41k
TOTAL $113k
*May be negative reflecting an increased cost component required to save energy and costs overall

168

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $546k 92k
MMBtu
$7.26
- Electrical $312k 6,421k
kWh
$0.061
- Natural Gas $140k 25k
MMBtu
$5.40

557

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $18k 2.3k
MMBtu
2.5%
- Electrical $12k 223k
kWh
3.5%
- Natural Gas $3.9k -
MMBtu
-
Waste $1.1k
Productivity/Other $9.2k
TOTAL $29k
*May be negative reflecting an increased cost component required to save energy and costs overall