ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Electrical industrial apparatus
3+ Characters Required for Products

185

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $593k 99k
MMBtu
$7.53
- Electrical $320k 6,387k
kWh
$0.062
- Natural Gas $148k 26k
MMBtu
$5.50

1,407

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $75k 7.1k
MMBtu
7.2%
- Electrical $40k 695k
kWh
10.9%
- Natural Gas $24k -
MMBtu
-
Waste $4.5k
Productivity/Other $41k
TOTAL $121k
*May be negative reflecting an increased cost component required to save energy and costs overall

178

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $565k 96k
MMBtu
$7.49
- Electrical $314k 6,253k
kWh
$0.062
- Natural Gas $137k 25k
MMBtu
$5.50

586

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $21k 2.4k
MMBtu
2.5%
- Electrical $14k 236k
kWh
3.8%
- Natural Gas $3.7k -
MMBtu
-
Waste $1.0k
Productivity/Other $8.9k
TOTAL $30k
*May be negative reflecting an increased cost component required to save energy and costs overall