ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Switchgear and switchboard apparatus
3+ Characters Required for Products

50

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $427k 61k
MMBtu
$8.00
- Electrical $288k 4,685k
kWh
$0.066
- Natural Gas $75k 12k
MMBtu
$8.65

386

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $45k 4.4k
MMBtu
7.2%
- Electrical $29k 428k
kWh
9.1%
- Natural Gas $6.2k -
MMBtu
-
Waste $6.2k
Productivity/Other $27k
TOTAL $77k
*May be negative reflecting an increased cost component required to save energy and costs overall

46

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $413k 61k
MMBtu
$7.58
- Electrical $280k 4,798k
kWh
$0.061
- Natural Gas $73k 11k
MMBtu
$9.00

174

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $17k 2.0k
MMBtu
3.2%
- Electrical $10k 190k
kWh
4.0%
- Natural Gas $3.1k -
MMBtu
-
Waste $0.4k
Productivity/Other $20k
TOTAL $37k
*May be negative reflecting an increased cost component required to save energy and costs overall