ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Electric transmission and distribution equipment
3+ Characters Required for Products

101

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $444k 65k
MMBtu
$7.89
- Electrical $263k 4,682k
kWh
$0.062
- Natural Gas $95k 14k
MMBtu
$7.48

762

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $54k 3.1k
MMBtu
4.7%
- Electrical $27k 300k
kWh
6.4%
- Natural Gas $10k -
MMBtu
-
Waste $5.3k
Productivity/Other $21k
TOTAL $80k
*May be negative reflecting an increased cost component required to save energy and costs overall

97

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $432k 65k
MMBtu
$7.64
- Electrical $255k 4,662k
kWh
$0.061
- Natural Gas $91k 14k
MMBtu
$7.49

342

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $20k 0.7k
MMBtu
1.0%
- Electrical $10k 67k
kWh
1.4%
- Natural Gas $4.8k -
MMBtu
-
Waste $0.6k
Productivity/Other $14k
TOTAL $34k
*May be negative reflecting an increased cost component required to save energy and costs overall