ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Electric transmission and distribution equipment
3+ Characters Required for Products

100

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $438k 65k
MMBtu
$7.89
- Electrical $259k 4,630k
kWh
$0.062
- Natural Gas $91k 14k
MMBtu
$7.45

750

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $53k 3.0k
MMBtu
4.6%
- Electrical $27k 292k
kWh
6.3%
- Natural Gas $9.9k -
MMBtu
-
Waste $5.3k
Productivity/Other $21k
TOTAL $79k
*May be negative reflecting an increased cost component required to save energy and costs overall

96

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $431k 64k
MMBtu
$7.68
- Electrical $255k 4,682k
kWh
$0.060
- Natural Gas $91k 13k
MMBtu
$7.56

338

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $20k 0.7k
MMBtu
1.0%
- Electrical $10.0k 65k
kWh
1.4%
- Natural Gas $4.9k -
MMBtu
-
Waste $0.6k
Productivity/Other $13k
TOTAL $34k
*May be negative reflecting an increased cost component required to save energy and costs overall