Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Electronic and other electrical equipment and components, except computer equipment
3+ Characters Required for Products

1,209

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $568k 98k
MMBtu
$7.98
- Electrical $362k 6,842k
kWh
$0.066
- Natural Gas $92k 17k
MMBtu
$5.59

8,922

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $69k 8.0k
MMBtu
8.2%
- Electrical $47k 782k
kWh
11.4%
- Natural Gas $8.8k -
MMBtu
-
Waste $4.2k
Productivity/Other $45k
TOTAL $119k
*May be negative reflecting an increased cost component required to save energy and costs overall

1,165

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $556k 97k
MMBtu
$7.81
- Electrical $357k 6,860k
kWh
$0.065
- Natural Gas $90k 17k
MMBtu
$5.52

3,955

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $23k 2.7k
MMBtu
2.8%
- Electrical $17k 268k
kWh
3.9%
- Natural Gas $2.7k -
MMBtu
-
Waste $1.3k
Productivity/Other $19k
TOTAL $43k