The ITAC Statistics page displays the average assessment results for the selected criteria.
SIC 36 Electronic and other electrical equipment and components, except computer equipment

1,181

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $562k 97k
MMBtu
$7.85
- Electrical $362k 6,877k
kWh
$0.065
- Natural Gas $91k 17k
MMBtu
$5.53

8,731

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $68k 8.0k
MMBtu
8.3%
- Electrical $47k 783k
kWh
11.4%
- Natural Gas $8.8k -
MMBtu
-
Waste $4.0k
Productivity/Other $44k
TOTAL $116k
*May be negative reflecting an increased cost component required to save energy and costs overall

1,135

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $561k 98k
MMBtu
$7.65
- Electrical $360k 6,953k
kWh
$0.064
- Natural Gas $91k 17k
MMBtu
$5.43

3,858

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $23k 2.8k
MMBtu
2.8%
- Electrical $17k 272k
kWh
3.9%
- Natural Gas $2.7k -
MMBtu
-
Waste $1.3k
Productivity/Other $18k
TOTAL $43k
*May be negative reflecting an increased cost component required to save energy and costs overall