ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Electronic and other electrical equipment and components, except computer equipment
3+ Characters Required for Products

1,093

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $553k 98k
MMBtu
$7.38
- Electrical $359k 6,997k
kWh
$0.062
- Natural Gas $87k 16k
MMBtu
$5.25

8,072

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $65k 8.0k
MMBtu
8.1%
- Electrical $44k 778k
kWh
11.1%
- Natural Gas $8.5k -
MMBtu
-
Waste $4.2k
Productivity/Other $45k
TOTAL $114k
*May be negative reflecting an increased cost component required to save energy and costs overall

1,084

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $551k 98k
MMBtu
$7.37
- Electrical $357k 6,982k
kWh
$0.062
- Natural Gas $87k 16k
MMBtu
$5.23

3,680

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $23k 2.7k
MMBtu
2.8%
- Electrical $17k 265k
kWh
3.8%
- Natural Gas $2.8k -
MMBtu
-
Waste $1.3k
Productivity/Other $18k
TOTAL $42k
*May be negative reflecting an increased cost component required to save energy and costs overall