ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Scales and balances, except laboratory
3+ Characters Required for Products

7

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $257k 38k
MMBtu
$7.31
- Electrical $151k 2,725k
kWh
$0.067
- Natural Gas $54k 10k
MMBtu
$5.17

47

Recommendations

6.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $24k 1.7k
MMBtu
4.5%
- Electrical $9.8k 170k
kWh
6.2%
- Natural Gas $8.2k -
MMBtu
-
Waste $1.9k
Productivity/Other $12k
TOTAL $38k
*May be negative reflecting an increased cost component required to save energy and costs overall

7

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $257k 38k
MMBtu
$7.31
- Electrical $151k 2,725k
kWh
$0.067
- Natural Gas $54k 10k
MMBtu
$5.17

15

Implemented Recommendations

2.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $7.4k 0.6k
MMBtu
1.5%
- Electrical $2.3k 57k
kWh
2.1%
- Natural Gas $4.2k -
MMBtu
-
Waste $0.0k
Productivity/Other ($-0.1)k
TOTAL $7.3k
*May be negative reflecting an increased cost component required to save energy and costs overall