ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Fluid power pumps and motors
3+ Characters Required for Products

20

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $526k 88k
MMBtu
$6.76
- Electrical $382k 7,514k
kWh
$0.055
- Natural Gas $51k 11k
MMBtu
$6.19

134

Recommendations

6.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $63k 7.4k
MMBtu
8.4%
- Electrical $44k 725k
kWh
9.6%
- Natural Gas $5.9k -
MMBtu
-
Waste $0.5k
Productivity/Other $6.2k
TOTAL $70k
*May be negative reflecting an increased cost component required to save energy and costs overall

18

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $505k 90k
MMBtu
$6.39
- Electrical $367k 7,592k
kWh
$0.053
- Natural Gas $54k 13k
MMBtu
$5.56

54

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $19k 3.1k
MMBtu
3.5%
- Electrical $15k 307k
kWh
4.0%
- Natural Gas $1.0k -
MMBtu
-
Waste -
Productivity/Other $0.1k
TOTAL $19k
*May be negative reflecting an increased cost component required to save energy and costs overall