ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Fluid power cylinders and actuators
3+ Characters Required for Products

38

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $312k 40k
MMBtu
$7.73
- Electrical $196k 3,262k
kWh
$0.054
- Natural Gas $33k 5.5k
MMBtu
$5.83

261

Recommendations

6.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $59k 3.4k
MMBtu
8.5%
- Electrical $23k 329k
kWh
10.1%
- Natural Gas $5.2k -
MMBtu
-
Waste $1.6k
Productivity/Other $22k
TOTAL $82k
*May be negative reflecting an increased cost component required to save energy and costs overall

33

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $295k 41k
MMBtu
$6.95
- Electrical $202k 3,408k
kWh
$0.052
- Natural Gas $33k 5.7k
MMBtu
$5.63

116

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $14k 1.7k
MMBtu
4.2%
- Electrical $8.6k 167k
kWh
4.9%
- Natural Gas $1.9k -
MMBtu
-
Waste $0.1k
Productivity/Other $1.9k
TOTAL $16k